| B&S Id | Descriptions |
| B-1: 1,15,728 Sq. Ft. | 6 Storied RCC Building. |
| Ground Floor | Yarn Warehouse |
| 1st Floor | Sewing, Finishing, Packing & Office area |
| 2nd Floor | Sewing, Finishing, Packing & FQC/Training Room |
| 3rd Floor | Cutting, Finished Fabrics relax area |
| 4th Floor | Sewing, Finishing & Finished Goods storage area. |
| 5th Floor | Sewing, Finishing, Packing & Office |
| | |
| B-2: 1, 00,002 Sq. Ft. | 6 Storied RCC Building. |
| Ground Floor | General Store, Admin Office, Embroidery, Finished Goods and loading area. |
| 1St Floor | Knitting Section |
| 2nd Floor | Knitting Section |
| 3rd Floor | Cutting, Sample, CAD Section, Conference Room |
| 4th Floor | Sewing, Finishing, Packing |
| 5th Floor | Sewing, Finishing, Packing |
| | |
| B-3: 1,48,560 Sq. Ft. | 6 Storied RCC Building. |
| Ground Floor | Dyeing Finishing section |
| Mezzanine Floor | Physical Lab |
| 1St Floor | Finished Fabric Store, Leftover and Woven fabric store, Office |
| 2nd Floor | Cutting Section, Finished Goods Area |
| 3rd Floor | Sewing, Finishing, Packing section |
| 4th Floor | Sewing, Finishing, Packing section |
| 5th Floor | Printing Section |
| | |
| B-4: 89,660 Sq. Ft. | 6 Storied RCC Building. |
| Basement | Canteen & Dining Hall |
| Ground Floor | Batch storage Section |
| 1St Floor | Grey Fabric Store |
| 2nd Floor | Sewing Section |
| 3rd Floor | Office Area, Cutting & Finishing Section |
| 4th Floor | Accessories storage area. |
| 5th Floor | Printing Section |
| | |
| B-5: 82,248 Sq. Ft. | 6 Storied RCC Building. |
| Ground Floor | Washing |
| 1St Floor | Brushing and Raishing |
| 2nd Floor | Knitting Section |
| 3rd Floor | Knitting Section |
| 4th Floor | Warehouse |
| 5th Floor | Warehouse |
| | |
| B-6: 2738 Sq. Ft. | 2 Storied Steel Fabricated Building with mezzanine floor. (Generator and EGB) |
| Ground Floor | Generator |
| Mezzanine Floor | Boiler Filter |
| 1St Floor | EGB |
| | |
| B-7: 2, 500 Sq. Ft. | 2 Storied Medical Centre, Childcare Center. |
| ETP Building 52200 sq.ft | ETP 17400×3=52200 s.ft |
| Shed-01: 200 Sq. Ft. | Security Office |
| Shed-02: 4099 Sq. Ft. | 2 Storied Gas Generator and EGB |
| Shed-03: 17,958 Sq. Ft. | Single Storied Dyeing Finishing, Chemical Lab & Washing Drayer |
| Shed-04: 2,836 Sq. Ft. | Compressor |
| Shed-05: 19,680 Sq. Ft. | Single Storied Dyeing and WTP |
| Shed-06: 450 Sq. Ft. | Fire Pump and Control Panel Room |
| Shed-07: 2,200 Sq. Ft. | Single Storied Workshop |
| Shed-08: 3,024 Sq. Ft. | Single Storied Boiler House |
| Shed-09: 5,547 Sq. Ft. | Single Storied Sub-Chemical store and Sample Dyeing |
| Shed-10: 8,816 Sq. Ft. | Single Storied Collar Section (Flat Knit), wastage Yarn Warehouse, Wastage Warehouse, Stock Lot Goods. |
| Shed-11: 7,130 Sq. Ft. | Single Storied Finished Goods Warehouse |
| Shed-12: 9,840 Sq. Ft. | Single Storied Chemical Warehouse |
| Shed-13: 1,020 Sq. Ft. | Mobil/Lubricant Room, Pump Room and Diesel Generator |
| Shed-14: | RMS Room; 264 Sq. Ft |
| Shed-15: | Container-4 Set; 1600 Sq. Ft. |
| Shed-16: | Utility Office; 200 Sq. Ft. |
| Shed-17: | Security Post; 580 Sq. Ft. |